Stage 2 · Building regulations
Building regs drawings that builders can actually build from
Technical plans, sections, details and specification for building control, drawn by an engineer who understands how it goes together on site.
Where engineering matters most
Building regulations drawings show how your extension is built: foundations, beams, insulation, drainage, fire safety and ventilation. They're what building control approves and what your builder prices from. Vague drawings lead to vague quotes and extra costs part-way through.
Because Ashbridge is engineer-led, beams, foundations and drainage are designed properly from the start. Add in-house structural calculations with the Complete package, so building control gets one consistent set of documents.
What's included
- Technical floor plans and sections
- Technical elevations
- Construction details: foundations, walls, roof, junctions
- Specification notes to Approved Documents
- Building control submission and management
- Changes requested by building control
Not included
- Building control fees
- Structural calculations (included in the Complete package)
Questions
Do I need building regs drawings if I have planning permission?
Do you visit the property?
Do council fees come on top?
Ready for a fixed price?
Tell us about your project or the home you're buying. You'll get a clear, fixed quote, usually the same day.
